Application

Petar from Macedonia applies for Blue Card Germany

Mechanical engineers

Personal data:

For personal data please contact us
with the following Applicants-ID: 14606

Profession:

Name of profession: Mechanical engineers Name of latest business sector: Latest occupation/title: Latest main activities:

Education:

Completed education: bachelor Title or Qualification: B. Sc. In Mechanical Engineering Specialisation: Additional trainings:

Preferred countries:

1. Preferred country | region / city: Germany | Dortmund 2. Preferred country | region / city: Germany | Cologne 3. Preferred country | region / city: |

Language skills:

1. Language skills: english => excellent 2. Language skills: 3. Language skills: Bulgarian,Serbian,Croatian => excellent

Personal note /detailed application:

Other skills (e.g. computer literacy, etc.): AUTO CAD, Microsoft office (Word, Excel, Power point), Microsoft Project, Internet\r\n10. Years of professional experience: 14\r\n11. Key qualifications: \r\n• Design and performing of carbon steel and stainless steel pipelines\r\n• Carbon steel process equipment\r\n• Stainless steel process equipment\r\n• Waste water treatment plant\r\n• Tehnology for processing of stainless steel and high alloy materials\r\n• Planning, organizing, managing and controlling of daily, weekly and monthly operations\r\n• Managing the purchase of materials\r\n• Preparing and submitting budget estimates for project’s connected with production of stainless steel process equipment, production of hydraulically and water filtration systems and their installations.\r\n\r\n12. Professional experience:\r\nDate: from (month/year) to (month/year) 1998-2005\r\nPlace Kochani\r\nCompany/organisation TING INOX Dooel\r\nPosition Chief mechanical engineer \r\nDate: from (month/year) to (month/year) 2006-2013\r\nPlace Kochani\r\nCompany/organisation VE-KO JTD \r\n \r\nPosition Tehnical manager \r\nJob description/Responsibilities Designing, performing and installation of hydraulic systems, waste water equipment, pipelines and carbon steel process equipment and installations\r\nPlanning, organizing, managing and controlling of daily, weekly and monthly operations\r\nManaging the purchase of materials\r\nProblem solving and decision-making\r\nExecuting of Complex projects\r\nProject management and adoption of new productions\r\nImplementation of technologic changes required by\r\ncustomers\r\nImplementation of standards: ISO 9001:2008\r\nISO 14001:2004\r\n\r\n13. Publications and seminars:\r\n1999 Company TOMIKKA / BULGARIA \r\n Training course for quality and technical characteristics of stainless steel’s, \r\n\r\n Company SILCO INOX / service center in HUNGARY\r\nTraining course for quality and technical characteristics of stainless steel’s, product of Italian concern TERNI\r\n2001 Company CRONE/ HOLLAND\r\nTraining course for instalation,operation and maintains of boilers that are using a biomass like fuel,prduct of CRONE\r\n\r\n\r\n14. References:\r\n\r\n \r\n- Planning, construction and installation of stainless steel \r\nequipment INOX AISI 304 for candy industry composed of 1 \r\nkeeping double coated vessel electrically heated V=1000 lit \r\nfor chocolate, 1 keeping double coated vessel electrically \r\nheated V=1000 lit for marmalade, 1 melting vessel for \r\nvegetable oil V= 400 lit transport lines, pumps for chocolate, \r\nmarmalade and melted oil for VITAMINKA Prilep. \r\n\r\n- Planning, construction and installation of complete line \r\nfrom stainless steel INOX AISI 304 for grilled conserve \r\nindustry with capacity of 2000 kg final product/ day for JOMI \r\nFOOD Veles \r\n\r\n- Installation of technological pipelines INOX AISI 316 and \r\ninstallation of the equipment for new cooking oil refinery \r\nBRILIJANT Stip \r\n\r\n \r\n\r\n \r\n\r\n - Planning, construction and Installation of counter flow tube \r\nheat exchanger INOX AISI 316 with capacity of P=135 kW \r\nfor new cooking oil refinery BRILIJANT Stip \r\n\r\n- Planning, construction and Installation of counter flow tube \r\nheat exchanger INOX AISI 316 with capacity of P=160kW \r\nand P=60 kW for new cooking oil refinery BRILIJANT Stip \r\n- Planning, construction and installation of complete, \r\nstainless steel INOX AISI 304, line for filtering, polishing and \r\npreservation with gas Nitrogen, for cooking oil, capacity of \r\nQ=5000 Lit/h, Zito Oriz Ko, Kocani \r\n\r\n- Planning, construction and installation of complete, \r\nstainless steel INOX AISI 304, line for beer production with \r\ncapacity of 2000 Lit/day EVROBALKAN SERBIA \r\n-Project manager of stainles steel AISI 316L pipeline for HP \r\nwater for drug plant TREPHARM – Pristina \r\n\r\n-Project manager of of stainless steel AISI 316L pipeline for \r\nP water for drug plant REPLEK Skopje. \r\n\r\n- Assistant project manager Construction of edible Oil \r\ncristalizators V=35m3 4 pcs., Mixer tank V=15 m3 1 pcs., \r\nOil separators 2 pcs., Mixer units 2 pcs., Storage bunker \r\nV=20 m3 1 pcs. for HARBURG FROIDENBERGER \r\nGERMANY \r\n\r\n- Project manager for Planning and construction of \r\nstainless steel equipment INOX AISI 316 for new production \r\nline for catalyst -108 vessels JOHNSON MATTHEY \r\nMACEDONIA \r\n\r\n-Planning and construction of Incolloy 825 equipment for \r\nproduction line for catalyst - JOHNSON MATTHEY \r\nROYSTON, UK \r\n\r\n-Planning and construction of Incolloy 825 autoclave for \r\nnew production line for catalyst - JOHNSON MATTHEY \r\nMACEDONIA \r\n\r\n-Planning, construction and installation of stainless steel \r\nequipment INOX AISI 316 for new production line for vehicle \r\ncatalyst -16 vessels JOHNSON MATTHEY MACEDONIA \r\n\r\n-Project manager for construction and production of \r\nAluminum equipment for new production line for JOHNSON \r\nMATTHEY USA \r\n\r\n-Planning, construction and production of vacuum vessels \r\nfor new production line for JOHNSON MATTHEY USA \r\n\r\n-Project manager for rebuilding of dryer for catalyst \r\nJOHNSON MATTHEY MACEDONIA \r\n\r\n-Participation in working team for continous improvement in \r\nJOHNSON MATTHEY MACEDONIA \r\n\r\n-Project manager for Construction of edible Oil cristalizators \r\nV=35m3 4 pcs., Mixer tank V=15 m3 1 pcs., Oil separators \r\n2 pcs., Mixer units 2 pcs., Storage bunker V=20 m3 1 pcs. \r\nfor HARBURG FROIDENBERGER GERMANY \r\n \r\n\r\n\r\n\r\npipeline for geothermal hot water (DN2500; L=150 m) in system \"Geoterma\" Ko?ani, Macedonia (supported by federal chancellery of republic of Austria).\r\n- design and installation of additional adaptations for full automatisation on filter station for reinjectional geothermal water for system »Geoterma« Kocani, Macedonia (supported by federal chancellery of republic of Austria).\r\n - redesign and adaptations on geothermal heating and distribution system in ZIK Bregalnica Vinica, Macedonia (supported by federal chancellery of republic of Austria).\r\n - Installation of submersible pumps for geothermal hot water (Q1=12 Lit/sec, P=30kW, Hinstallation =50m)\r\n(Q2=12 Lit/sec, P=37 kW, Hinstallation=90m)\r\n(Q3=32 Lit/sec, P=75 kW, Hinstallation=90 m)\r\n ZIK Bregalnica Vinica, Macedonia (supported by federal chancelary of republic of Austria).\r\n Design and installation.\r\n– Water supply system Blatec, Macedonia\r\nDesign, construction and installation.\r\n – Filter for water supply system M.Kamenica, Macedonia;\r\nInstallation of equipment in co-operation with SEIC, Italy.\r\n- Design and construction of gravity multimedia filter for drinking water 72 m3/Hr, for municipality of Blatec\r\n- Installation of sewerage system for village Grdovci with total length of 800 m supported by GTZ-Germanija\r\n Installation of sewerage system for village Pribacevo with total length of 1054 m financed by municipality of Orizari- I phase\r\n Production and installation of mild steel lifting pipeline ??508 mm total length of 1450 m, overinflantation station and complete hydromechanical equipment for water treatment plant Kocani\r\n- Planning, construction, production and installation of deposition tank for drinking water, in frames of water treatment plant in Sveti Nikole with capacity of Q=300 lit/sek Sveti Nikole\r\n - Planning, construction, production and installation of raiser for natural Co2 made of stainless steel tubes with total debt of 360 m, GEOLAB Skopje\r\n- Stainless steel equipment for candy industry MULTIKREM Stip, machines for chocolate, homogenizers , transport lines, pumps for chocolate\r\n – Mill \"BRVENICA\", Tetovo, Macedonia; design, production and installation of steel construction for the mill equipment,\r\n- Stainless steel equipment for candy industry MULTIKREM Stip, machines for chocolate, homogenizers, transport lines, pumps for chocolate, DOGAN Stip\r\n Planning, construction and installation of grain silo with total quontity of V=1680 t -mill MILENKOV Delcevo\r\n- Planning, construction and installation of equipment for vertical and horizontal transport of grain – mill MILENKOV Delcevo\r\n- Planning, construction and production of heaters for melting of paraphine made of stainless steel for BRILIJANT-Stip\r\n- Planning, construction and production of ice water machine with capacity of Q=1200 lit/hour for diary GABROVO Delcevo\r\n- Planning, construction and installation of grain silo with total quantity of V=150 t, mill BRVENICA TETOVO\r\n- Planning, construction and installation of equipment for vertical and horizontal transport of grain – mill BRVENICA TETOVO\r\n- Design, production and installation of dryer for furniture made of hot water heat exchangers ALPIN KOM Delcevo.\r\n- Planning, construction and production of milk equipment with capacity of Q=1200 lit/hour for diary Mlecen Pat ,Makedoska Kamenica donated by USAID –United States\r\n- Design, construction and installation of processing vessel from stainless steel triple coated, steam heated, V=1000 lit for dairy ZDRAVJE Kumanovo\r\n- Polyurethane insulation covered with Al cover of transport tank for C02 with capacity of B=20 m3 for MESSER Skopje\r\n-Vertical mixer for mixing of water glass for vessel V=45 m3 for ZEOLIT BSB, Probistip\r\n- Planning, construction and installation of stainless steel INOX AISI 304 frames for oil filter press for BRILIJANT STIP\r\n-Design,production and installation of wetting system for beech woods for veneer production with boiling water heat exchangers ALPIN Dooel Delcevo\r\n-Design,production and installation of drying system for beech veneer production with boiling water heat exchangers with capacity of 12 m3/shift ALPIN Dooel Delcevo \r\n-Design,production and installation of extension for existing drying system for beech veneer production with boiling water heat exchangers and changing the capacity from 12 m3/shift to 16 m3/shift LAMKOR-R Bulgaria \r\n-Design,production and installation drying system for beech veneer production with boiling water heat exchangers with capacity of 12 m3/shift LAMKOR-R Bulgaria \r\n\r\n \r\n- Installation of submersible pump for geothermal hot water ( Q=100 Lit/sec, P=160 kW, Hinstallation=100 m) in system \"Geoterma\" Ko?ani, Macedonia (supported by federal chancellery of republic of Austria).\r\n\r\n – Installation of filter unit for reinjection of geothermal hot water (AMIAD EBS 8” ;Q=2x150m3/h; 10?m) in system \"Geoterma\" Ko?ani, Macedonia (supported by federal chancellery of republic of Austria).\r\n – Installation of preinsulated buried pipeline for geothermal hot water (DN2500; L=150 m) in system \"Geoterma\" Ko?ani, Macedonia (supported by federal chancellery of republic of Austria).\r\n- design and installation of additional adaptations for full automatisation on filter station for reinjectional geothermal water for system »Geoterma« Kocani, Macedonia (supported by federal chancellery of republic of Austria).\r\n - redesign and adaptations on geothermal heating and distribution system in ZIK Bregalnica Vinica, Macedonia (supported by federal chancellery of republic of Austria).\r\n - Installation of submersible pumps for geothermal hot water (Q1=12 Lit/sec, P=30kW, Hinstallation =50m)\r\n(Q2=12 Lit/sec, P=37 kW, Hinstallation=90m)\r\n(Q3=32 Lit/sec, P=75 kW, Hinstallation=90 m)\r\n ZIK Bregalnica Vinica, Macedonia (supported by federal chancelary of republic of Austria).\r\n Design and installation.\r\n– Water supply system Blatec, Macedonia\r\nDesign, construction and installation.\r\n – Filter for water supply system M.Kamenica, Macedonia;\r\nInstallation of equipment in co-operation with SEIC, Italy.\r\n- Design and construction of gravity multimedia filter for drinking water 72 m3/Hr, for municipality of Blatec\r\n\r\n- Installation of sewerage system for village Grdovci with total length of 800 m supported by GTZ-Germanija\r\n-Production and installation of mild steel lifting pipeline ??508 mm total length of 1450 m, overinflantation station and complete hydromechanical equipment for water treatment plant Kocani\r\n -Design,production and installation of extension for existing drying system for beech veneer production with boiling water heat exchangers and changing the capacity from 12 m3/shift to 16 m3/shift LAMKOR-R Bulgaria \r\n-Design,production and installation drying system for beech veneer production with boiling water heat exchangers with capacity of 12 m3/shift LAMKOR-R Bulgaria \r\n
 

Facebook

Google Plus