Application

REZA from IRAN applies for Blue Card Germany

Engineering professionals not elsewhere classified

Personal data:

For personal data please contact us
with the following Applicants-ID: 12303

Profession:

Name of profession: Engineering professionals not elsewhere classified Name of latest business sector: OIL AND GAS Latest occupation/title: TCHNICAL INSPECTION Latest main activities: NDT INSPECTOR

Education:

Completed education: bachelor Title or Qualification: INDUSTRIAL ENG.NDT INSPECTOR Specialisation: TOFD & PAUT oprator-MT-UT-PT-RT Additional trainings: RT HSE oficer

Preferred countries:

1. Preferred country | region / city: Germany | 2. Preferred country | region / city: United Kingdom | 3. Preferred country | region / city: Austria |

Language skills:

1. Language skills: english => well 2. Language skills: 3. Language skills: =>

Personal note /detailed application:

CERTIFICATION
• Advanced course of radiation protection(AEOI)
• Radiographic Testing ASNT Level II
• Ultrasonic Testing ASNT Level II
• Magnetic Particle Testing ASNT Level II
• Liquid Penetrant Testing ASNT Level II
• Certified Welding Inspector (CWI)
• Phased Array Ultrasonic Examination Testing CSWIP Level II
• Time Of flight diffraction CSWIP Level II
QUALIFICATION
• Training course of radiographic testing level II (ait)
• Training course of magnetic particle testing level II (ait)
• Training course of liquid Penetrant testing level II (ait)
• Training course of Ultrasonic testing level II (ait)
• Training course of Certified Welding Inspector (CWI)
• Advanced course of radiation protection (AEOI)
• Training course of Phased Array Ultrasonic Examination Testing Level II (TWI)
• Training course of Time Of flight diffraction level II(TWI)
Computer Knowledge
• Ms Excel
• Ms Access
• MS Word
• Auto cad
• Ms Project
• Ms power points
Interested Hobbies
• psychologically books studying
• Exercise
• English studying
• EXPERIENCE
? Arya SGS (IOOC)
• Since Nov.2009
• NDT supervisor & technical Inspector
• Project
1. Kharg island gas gathering & NGL recovery project offshore Pipeline( Hydro test & Pre Commissioning )( technical Inspector)
2. Kharg island gas gathering & NGL recovery project .
a. Boiler installation
b. Double wall tank construction
c. Pile welding& driving
d. Onshore pipeline
e. Utility storage tank
f. Slug catcher
3. Reshadat Renovation & Development Project Topside &Bridges (technical Inspector)

? ARTA INDUSRY TESTING(part time)
• Since Oct.2010
• Radiography Health Physics officer
• UT Inspector
? 3T (part time)
• since Sep.2011 to mar.2012
• Phased Array and TOFD Inspector and Interpreter
• South pars gas field development phases 15&16 (PAYANDAN)piping

? Kavoshgaran baser
• FROM Apr.2010 to Sep 2011
• Phased Array Inspector and Interpreter
• project
1. Arak oil refinery separator tower
2. Ghaenat Steel complex day bin tank
3. Ilam separator facility slug catcher
4. Mashkid dam piping& steel lining
5. Siyah bishe pumped dam project steel lining

? ARTA INDUSRY TESTING
• FROM Sep.2006 to Nov.2009
• Ultrasonic inspector & Interpreter /RT Interpreter
• Projects
1. South pars gas field development phase 12 cross support(IOEC) (PAUT)
2. Abbadan oil refinery development tower (MSP)(PAUT)
3. South pars gas field development phases 17&18 SPD23&24S Jacket Installation (IOEC).(UT) (MT( (SITE REP)
4. Reshadat Renovation & Development Project Jacket (TASDID)(UT)
5. SALMAN PIPELINE spool fabrication (IOEC).(UT)(RT(
6. DARQUAIN OIL FIELD DEVELOPMENT PROJECT PHASE 2) (ENI) .(UT Inspector& SITE Rep.(
7. South pars gas field development phases 17&18 (IOEC).(UT)(MT( (RT) (SITE REP)
8. South pars gas field development phases 9 &10 dog leg spool fabrication(IOEC).(UT)(RT)
9. Lavan LPG Recovery spherical tank (Winteco ). (RT) (SITE REP)
10. Lavan LPG Recovery Plant (Radira ).(RT) (SITE REP)
11. Sulphoric acisd production plant (NICI ).(UT) (RT)
12. Hegmatan cement Development (HCC).(UT) (RT)
13. Ekbatan Dam (Welding & Painting Inspector ((SITE REP)
? Persian Marine Co. (PMC(
• FROM Jul.2006 to Sep.2006
• NDT Supervisor
• South pars gas field development phases 9 &10 (Topside)(IOEC)
? AFP(AZMA FARADID PASARGAD)
• FROM Nov.2005 to Jul.2006
• Ultrasonic inspector & Interpreter / Welding Inspector/ PT Inspector
• Projects
1. Parsian gas refinery steel structure (payandan)
? Sadra
• FROM Aug-2003 to Feb 2004
• Welding Inspector
• Project
1. Sea water intake & cooling water distribution plant of the mobine utility complex in assaluyeh .

? Instrument I used before
Harfang
Sonatest
AGR
phasor
 

Facebook

Google Plus