Application

Azadeh from Iran applies for Blue Card Germany

Mechanical engineers

Personal data:

For personal data please contact us
with the following Applicants-ID: 11778

Profession:

Name of profession: Mechanical engineers Name of latest business sector: Nargan NEC Latest occupation/title: Senior piping engineer Latest main activities:

Education:

Completed education: bachelor Title or Qualification: Aerospace engineering Specialisation: Fluid mechanics Additional trainings: MBA (Strategic management)

Preferred countries:

1. Preferred country | region / city: Germany | 2. Preferred country | region / city: Netherlands | 3. Preferred country | region / city: France |

Language skills:

1. Language skills: english => excellent 2. Language skills: french => reasonable 3. Language skills: German => reasonable

Personal note /detailed application:

EDUCTION\r\n \r\n• 2011-2012 Amirkabir University Technology\r\nMsc in MBA-Strategic\r\n• 1998-2002 Amirkabir University of Technology, Tehran, Iran\r\n B.Sc in Aerospace Engineering (Mechanical Engineering)\r\n\r\n• 1994-1998 Narjess High School, Tehran, Iran\r\n Diploma in Math & Physics\r\n\r\n \r\n\r\nWORK EXPERIENCE\r\n• September 2012-Present Nargan Engineering & Construction\r\n• Piping Lead Engineer in ILAM OLEFIN\r\n\r\n• Coordinating between Civil, Steel Structure, safety ,Process departments\r\n• Attending the design review sessions\r\n• Attending kick of meeting\r\n• Piping routing flexibility study\r\n• Studying TBE s\r\n• Coordinating the outsourced design area having the Nargan Value Chain in mind \r\n• Controlling Nargan EDMS system\r\n• April 2012- August 2012 Nargan Engineering\r\n• Piping Senior Engineer in SPGFD Projects - Phase 12\r\n• Leader assistant in SPGFD Projects - Phase 12\r\n• Coordinating between Civil, Steel Structure, safety ,Process departments\r\n• Attending the design review session\r\n• Controlling , distributing and checking EDMS (Electronic Document Management system)\r\n• Model review\r\n• September 2011- March 2012 KCI The Engineers\r\n• Piping senior engineer designing Off-shore transformer Multi-Purpose Platform Riffgat with Hollandia\r\n• July 2010-September2011 Nargan Engineering\r\n• Piping Senior Engineer in SPGFD Projects - Phase 13\r\n• Leader assistant in SPGFD Projects - Phase 13\r\n• Designer of all the UG network (Sea water, Fire water,…)\r\n• Coordinating between Civil, Steel Structure, safety ,Process departments\r\n• Attending the design review session\r\n• Controlling , distributing and checking EDMS (Electronic Document Management system)\r\n\r\n• July 2010-September2011 Nargan Engineering\r\n• Piping Senior Engineer in SPGFD Projects - Phase 22,23,24\r\n• Leader assistant in SPGFD Projects - Phase 22,23,24\r\n• Senior Leader in SPGFD Projects - Phase 22,23,24\r\n• Designer of all the UG network (Sea water, Fire water,…)\r\n• Coordinating between Civil, Steel Structure, safety ,Process departments\r\n• Attending the design review session\r\n• Controlling , distributing and checking EDMS (Electronic Document Management system)\r\n\r\n February 2010 – June 2010 Sadra Group (Iran Marine Engineering Company )\r\n\r\n• PSL in Piping department (Project Senior Leader) , Wellhead Facilities, Flow lines of Oil Gathering and Transmission, Oil production Facilities & Gas Gathering and Injection of KHESHT Oil Field (CPF) \r\n• Active as a member of project team in the integrated EPC work process ,for engineering, selection, production, fabrication, inspection, testing, delivery, shipment, installation and (pre)commissioning of materials\r\n• Provide and improve checklists for Equipment and piping QC.\r\n• Manage and supervise the tasks taken by engineers under my supervision\r\n• Review , check and take the responsibility for works performed by employees under my supervision\r\n• Attending Kick of meetings\r\n• Apply all relevant procedure, practices and standards\r\n• Achieve the total quality and SHE objectives set for the project\r\n• Audit work of other disciplines teams.\r\n• Checking and accepting TBE’s\r\n• Checking and commenting on other discipline IDC’s\r\n• Checking and accepting MR’s\r\n• Setting weekly meetings with team members to control the improvement of job\r\n• Attending weekly meetings with Project engineering manager \r\n• Report the improvement of jobs done by team to piping manager and project manager\r\n• In contact with other discipline Engineers/other Lead Engineers\r\n• In contact with other department (piping, piping material, Execution, Project/Area ) managers\r\n• In contact with Construction/site team\r\n• In contact with Purchasing , Estimating, Inspection and Cost control/scheduling Department\r\n• September 2009 – January 2010 CB&I Lummus Technology, The Hague, Netherlands\r\n\r\n• Project senior engineer ,YANBU export refinery project proposal\r\n• Feasibility study\r\n• Routing study of the critical lines\r\n• Routing study of the piping over the rack\r\n• Studying rack load and width\r\n• January 2009 – September 2009 CB&I and Lummus Technology, The Hague, Netherlands\r\n• Piping senior engineer , SNR integrated HDS_6 project\r\n• Collecting required data from existing plant\r\n• Revising Plot plan according to certain requirements \r\n• Routing study over the racks and slipper ways\r\n• Attending Process weekly meetings\r\n• Piping design \r\n• Attending Shell safety classes\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n• September2007_ January 2009 Sazeh Consultants , Tehran, Iran \r\n\r\n• Project Engineer, Bidboland Gas Treating Company, Aghajery, Iran\r\n• Detail Engineering for Bidboland Gas Treating Company, Aghajery, Iran\r\n• Preparing the Deliverable Lists\r\n• Piping Design and Support of Bidboland Gas Treating Company\r\n• Stress Analysis Calculation for critical lines\r\n• Participating Bidboland Gas Treating Company Kick Off Meetings\r\n• Participating in Bidboland Gas Treating Company Coordination Meetings\r\n\r\n\r\n• February 2007 – September 2007 Sazeh Consultants ,Tehran, Iran \r\n\r\n• Project engineering manager assistant\r\n• Quality Control for Kermapol HDPE.\r\n• Research and Development on Bidboland Gas Treating Company in Aghajary\r\n• Feasibility Study for Bidboland Gas Treating Company in Aghajary\r\n• Basic Engineering for Bidboland Gas Treating Company in Aghajary\r\n• Preparing lessons learned document for MD/HDPE Pars, Marun HDPE, Jam HDPE by traveling to the site, inspecting TQs , meetings with client and c ontarctors\r\n\r\n\r\n• September 2005- February 2007 Sazeh Consultants ,Tehran, Iran \r\n• Project Engineer, HDPE Kermapol\r\n• Piping Design and support of HDPE plant in Kermanshah, Kermapol \r\n• Petrochemical Company.\r\n• Stress Analysis Calculation for critical lines\r\n\r\n\r\n\r\n• November 2004 - September 2005 Sazeh Consultants, Tehran, Iran\r\n\r\n• Quality Control for MD/HDPE. \r\n• Proposal preparation: Arak Refinery.\r\n• Proposal preparation: LLDPE in Assaluyah.\r\n• Proposal preparation: HDPE Complex in Kermanshah.\r\n• Preparing piping and process Guide for trainees and new commers\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n• August 2003-November 2004 Sazeh Consultants ,Tehran, Iran\r\n\r\n• Project Designer, MD/HDPE\r\n\r\n• Detail engineering for MD/HDPE in Assaluyeh.\r\n• Equipment Process checking for MD/HDPE. \r\n• Piping Design and support of MD/HDPE plant in Assaluyeh, Jam Petrochemical Company.\r\n• Stress Analysis Calculation for critical lines\r\n\r\n\r\n\r\n\r\n• March 2003-September 2003 Sazeh Consultants, Tehran, Iran\r\n\r\n• Project Designer, HDPE Marun\r\n\r\n• Piping Design and support of HDPE plant in Mahshahr, Marun Petrochemical Company.\r\n\r\n• Project Designer, HDPE Jam Sazeh Consultants, Tehran Iran\r\n\r\n• Piping Design and support of HDPE plant in Assaluyeh, Jam Petrochemical Company.\r\n• Computed the earthquake load on the overall structure. \r\n\r\n\r\nIT SKILLS\r\n \r\nTechnical Software: PDMS (Plant Design Management System), CeasarII, Auto plant, ANSYS, MATLAB, Maple, Fluent, Gambit, Mechanical Desktop, Auto cad, Solid Works. \r\nProgramming: Fortran90, C++,Q-Basic, Pascal, Visual Basic \r\nUtility Software: Microsoft Office Tools\r\n\r\nTRAINING COURSE \r\n• Piping Plant Design , May 2003\r\n• Introduction to PDMS software, August 2003\r\n• Introduction to SHE-MS(OHSAS18001,ISO14001) , October 2004\r\n• Introduction to ASME, October 2004\r\n• Introduction to ASTM, October 2004\r\n• Introduction into PDMS Administrate Module , November 2007 \r\n• CB&I document management system (iDOCS)\r\n• VCA course\r\n• CB&I - Financial Integrity and Assurance\r\n• CB&I Code of Ethics\r\n• CB&I - FCPA: Conducting International Business Properly\r\n• Intensive course on PIPELINE Design and hydrolic calculation, February 2010\r\n\r\n\r\n\r\n\r\n\r\n\r\nINSTRUCTOR \r\n \r\n• Introduction into Piping And Plant Design, September 2007\r\n• Introduction into ASTM Standard and Material selection ,October 2007\r\n• Introduction into ASME Standard and Material selection ,October 2007\r\n• Introduction into NACE Standard ,October 2007\r\n• Introduction into PDMS Design Module (Specialist) , November 2007 \r\n• Introduction to piping & Stress Analysis around Towers, November 2007 \r\n• Introduction to piping & Stress Analysis around Heaters, November 2007 \r\n• Introduction to piping & Stress Analysis around Air coolers, December 2007\r\n\r\n\r\nCERTIFICATES\r\n\r\n• VCA certificate and logbook\r\n• Piping design certificate\r\n• Basic and Advanced Certificate in Stress Analysis with CEASAR II\r\n\r\n\r\n\r\nLANGUAGE SKILLS\r\n• Fluent in Farsi and English (IELTS GRADE 7, speaking module 8)\r\n• Basic knowledge in French\r\n\r\nINTEREST \r\n \r\n Charity Activities, Making trips, Swimming, Reading, Music, Theatre\r\n\r\n\r\nMEMBERSHIP\r\n\r\n• Member of Iranian Aerospace Engineering Association.\r\n• Member of Polytechnic Graduate students’ society.\r\n• Member of Iranian Mechanical Engineers\r\n\r\n\r\n\r\n
 

Facebook

Google Plus